您当前的位置:
首页 >
文章列表页 >
Ground Settlement Prediction Method for Shield Tunneling Considering Rigid Pavement Thickness
更新时间:2025-08-27
    • Ground Settlement Prediction Method for Shield Tunneling Considering Rigid Pavement Thickness

    • Journal of Disaster Prevention and Mitigation Engineering   Vol. 45, Issue 4, Pages: 784-795(2025)
    • DOI:10.13409/j.cnki.jdpme.20240412001    

      CLC: P208
    • Received:12 April 2024

      Revised:2024-08-23

      Published:28 August 2025

    移动端阅览

  • LIAO Mengguang,LI Xianqi,DAI Huayang,et al.Ground Settlement Prediction Method for Shield Tunneling Considering Rigid Pavement Thickness[J].Journal of Disaster Prevention and Mitigation Engineering,2025,45(04):784-795. DOI: 10.13409/j.cnki.jdpme.20240412001.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Prediction of Unsaturated Soil Water Characteristic Curve Based on Machine Learning Algorithms

Related Author

ZHANG Xiayang
GAO You
YU Xiang
HE Wei

Related Institution

School of Civil & Environmental Engineering and Geography Science, Ningbo University
Hunan Zhimo Planning and Engineering Design Consulting Co. Ltd.
0