您当前的位置:
首页 >
文章列表页 >
Prototype Test Study on Loading Condition of Fiber‑optic Smart Bolts of an Assembled Utility Tunnel
更新时间:2025-09-25
    • Prototype Test Study on Loading Condition of Fiber‑optic Smart Bolts of an Assembled Utility Tunnel

    • Journal of Disaster Prevention and Mitigation Engineering   Vol. 42, Issue 5, Pages: 1085-1096(2022)
    • DOI:10.13409/j.cnki.jdpme.20210422002    

      CLC: TU443
    • Received:22 April 2021

      Revised:2021-06-08

      Published:28 October 2022

    移动端阅览

  • WEI Chao,ZHU Honghu,WANG Jiachen,et al.Prototype Test Study on Loading Condition of Fiber‑optic Smart Bolts of an Assembled Utility Tunnel[J].Journal of Disaster Prevention and Mitigation Engineering,2022,42(05):1085-1096. DOI: 10.13409/j.cnki.jdpme.20210422002.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

No data

Related Author

No data

Related Institution

No data
0