Simulation and Measured Research on Steel Truss Beam Pushing and Traversing Construction Adjacent to High Speed Railway
更新时间:2025-12-11
    • Simulation and Measured Research on Steel Truss Beam Pushing and Traversing Construction Adjacent to High Speed Railway

    • Vol. 38, Issue 6, Pages: 989-995(2018)
    • DOI:10.13409/j.cnki.jdpme.2018.06.013    

      CLC: 445.4
    • Published:2018

    移动端阅览

  • 王飞球, 荀智翔, 王浩, et al. Simulation and Measured Research on Steel Truss Beam Pushing and Traversing Construction Adjacent to High Speed Railway[J]. 2018, 38(6): 989-995. DOI: 10.13409/j.cnki.jdpme.2018.06.013.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

68

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis of Micro-disturbed Construction of Benoto Pile on Adjacent High-speed Railway Bridge
Review on the Characteristics of Wind Fields at Bridge Site in Mountainous Areas
Field Measurement and Numerical Simulation of Wind-induced Vibration of Super High-rise Building
Finite Element Analysis of Mechanical Properties of Pile-cap Connections for Prestressed Concrete Solid Pile Using Snap-in Mechanical Connection
Numerical Simulation of the Influence of Unloading Time on the Cracking and Stress Wave Propagation in a Circular Tunnel Surrounding Rock

Related Author

王飞球
张一鸣
王浩
荀智翔
朱克宏
许福友
周晶
徐枫

Related Institution

No data
0