Basement excavation work for a new building would result in soil movement behind the retaining structure.The soil movement might induce considerable bending moment and deflection on the pile foundations supporting existing structures nearby.In this paper
by using the explicit finite difference code FLAC
3D
the behavior of pile adjacent to multi-braced excavation is investigated.The modified-cam clay constitutive model is employed to model the non-linear stress-strain soil behavior
and the pile is assumed to have linear elastic behavior.The interface model incorporated in FLAC
3D
code has been used to simulate the soil/pile contact.In "standard"problem
the effects of different pile he
ad constraints on the pile response are investigated
the effects of lateral deflection of the wall
distance from the excavation face
pile stiffness
pile length and axial load on the pile response are also investigated when the pile head is free.The research finding is compared with other published case history and reasonably good agreement is found between them and could be valuable for the design and construction of the excavation.
Pile Response Adjacent to Braced Excavation [J] . A. T. C. Goh,K. S. Wong,C. I. Teh,D. Wen. Journal of Geotechnical and Geoenvironmental Engineering . 2003 (4)
Behavior of Pile Subject to Excavation-Induced Soil Movement [J] . C. F. Leung,Y. K. Chow,R. F. Shen. Journal of Geotechnical and Geoenvironmental Engineering . 2000 (11)
Pile Response Due to Excavation-Induced Lateral Soil Movement [J] . H. G. Poulos,L. T. Chen. Journal of Geotechnical and Geoenvironmental Engineering . 1997 (2)