曹兰柱, 高峰, 王东, et al. Research and Treatment for the Slope Stability of the Plunking-up Floor Area of Baiyinhua No.1 Open-pit Coal Mine[J]. 2017, 37(3): 462-468.
曹兰柱, 高峰, 王东, et al. Research and Treatment for the Slope Stability of the Plunking-up Floor Area of Baiyinhua No.1 Open-pit Coal Mine[J]. 2017, 37(3): 462-468. DOI: 10.13409/j.cnki.jdpme.2017.03.019.
Research and Treatment for the Slope Stability of the Plunking-up Floor Area of Baiyinhua No.1 Open-pit Coal Mine
To reveal the cause and the effects for the slope deformation failure mechanism and stability of the ground swelling
combining with the Baiyinhua No.1 open-pit coal mine of the east working slope engineering practice
according to the limit equilibrium theory
the shear strength parameters of the 2
#
coal roof weak layer is determined by using inversed analysis and the slope stability in the plunking-up floor area is evaluated on the basis of slope engineering geology.The numerical simulation of the optimized slope is simulated by Flac3D software
the study indicates that weak layer of the 2
#
coal seam and ground swelling are the decisive factors to control the stability of the slope.The slope slide model of the
plunking-up floor area is a combined sliding of shear arc-weak layer-ground swelling crack.Selecting security reserve coefficient is 1.1
the status quo slope of the 5
6
profile is to meet the requirements of saftey
and the status quo of the 1
4
profile is not satisfied with the security requirements.The original design slope of the 1
4
profile is not steady.Unstable slope is optimized and gived treatment by cutting slope
the overall slope angle of No.1 profile is 22° and No.2
4
profile is 24° after optimizing.Research can provide guidance for the eastern slope of Baiyinhua Surface Mine in treatment
for the safe production of similar open-pit mine has a certain reference value.
Slope stability analysis using the limit equilibrium method and two finite element methods [J] . S.Y. Liu,L.T. Shao,H.J. Li. Computers and Geotechnics . 2014