大直径泥水盾构下穿民房建筑群时沉降控制严格
风险较大。以南京纬三路过江通道工程S线大直径泥水盾构下穿保健村民房建筑群为背景
通过三维数值计算
对盾构施工主要影响区的范围和沉降量进行理论预测
在施工过程中根据理论预测结果对该范围内民房进行分类监测
并结合现场实测数据研究盾构施工对民房建筑群的影响
提出相应的沉降控制措施。研究结果表明:三维数值分析能够较好地预测盾构施工的影响范围及沉降量
可用于指导房屋沉降监测;盾构施工控制不当使得地表产生不均匀沉降、民房发生倾斜和裂缝等问题
通过控制支护压力、调整施工速度和壁后注浆等施工参数
并及时对地层进行注浆加固
有效地控制了地面沉降
保证了施工的顺利进行。
Abstract
On the background of the large diameter slurry shield crossing buildings at Baojian village in Weisanlu Yangtze River Tunnel(S line)
the authors establishe a three-dimensional numerical model to make a theoretical prediction on the main influence area and settlement value caused by shield crossing
and monitor the buildings within the area according to their classifications during construction process according to the predicted results.Then we combining with the field monitored data discuss the influence of shield construction on buildings
and putting forward corresponding control measures.Some conclusions could be drawn as follows:the main influence area and settlement value in shield construction can be predicted well in the three-dimensional numerical analysis
which can be used to guide the housing settlement monitoring and construction;improper controlling during shield construction makes uneven surface subsidence
buildings tilt and crack problems
and by controlling support pressure
adjusting construction parameters
such as the speed of construction and grouting
and grouting reinforcement for strata timely
ground settlement is effectively controlled.This ensures the progress of the construction smoothly.The results of this study can provide references in the large diameter slurry shield crossing buildings.