您当前的位置:
首页 >
文章列表页 >
Risk Analysis and Handling of Shield Construction in Watered Sandy Stratum from Large Volume Data
更新时间:2025-12-11
    • Risk Analysis and Handling of Shield Construction in Watered Sandy Stratum from Large Volume Data

    • Vol. 34, Issue 6, Pages: 742-750(2014)
    • DOI:10.13409/j.cnki.jdpme.2014.06.013    

      CLC: 455.43
    • Published:2014

    移动端阅览

  • 路占海, 王飞龙. Risk Analysis and Handling of Shield Construction in Watered Sandy Stratum from Large Volume Data[J]. 2014, 34(6): 742-750. DOI: 10.13409/j.cnki.jdpme.2014.06.013.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

149

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Numerical Study on Ground Displacement Induced by Shield Tunneling
Soil Settlements and Surrounding Structure Failure Mechanism due to Shield Tunneling in Metro Construction
Three-dimensional Numerical Simulation Analysis of Stratum Deformation Induced by Subway Shield Construction
Numeric Analysis of the Influence of Shield Driving on Single Pile with Variable Stiffness

Related Author

李琳
崔惟超
董光辉
张建新
杨敏
李炜明
李正明
任虹

Related Institution

No data
0