您当前的位置:
首页 >
文章列表页 >
Analysis of Seepage Safety of Dam without Foundation Pit during Reservoir Water Drawdown
更新时间:2025-12-11
    • Analysis of Seepage Safety of Dam without Foundation Pit during Reservoir Water Drawdown

    • Vol. 34, Issue 6, Pages: 731-735(2014)
    • DOI:10.13409/j.cnki.jdpme.2014.06.011    

      CLC: V641;TV223.4
    • Published:2014

    移动端阅览

  • 陈勇, 汤用泉. Analysis of Seepage Safety of Dam without Foundation Pit during Reservoir Water Drawdown[J]. 2014, 34(6): 731-735. DOI: 10.13409/j.cnki.jdpme.2014.06.011.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

73

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Review on the Model Tests for Earth-rock Dam Breach
Numerical Model for Piping Failure of Earth-rock Dam and Its Application
Analysis of the Formation Mechanism of Rainfall-induced Residual Soil Landslide
Artificial Boundary Processing Method for Dynamic Analysis of Earth-rock Dam
Study on Breach Process of Earth-rock Dam due to Seepage Failure

Related Author

曹伟
沈光泽
钟启明
张金池
吕晓倩
施倩
倪万魁
杜光波

Related Institution

No data
0