您当前的位置:
首页 >
文章列表页 >
Comparative Analysis on Displacement of Subway Station Excavated in Span with Top-down and Hole-pile Methods
更新时间:2025-12-11
    • Comparative Analysis on Displacement of Subway Station Excavated in Span with Top-down and Hole-pile Methods

    • Vol. 33, Issue S1, Pages: 31-37(2013)
    • DOI:10.13409/j.cnki.jdpme.2013.s1.007    

      CLC: 231.3
    • Published:2013

    移动端阅览

  • 史庆涛, 胡永利. Comparative Analysis on Displacement of Subway Station Excavated in Span with Top-down and Hole-pile Methods[J]. 2013, 33(S1): 31-37. DOI: 10.13409/j.cnki.jdpme.2013.s1.007.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

70

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Study on the Impact of Excavation Mode on Subway Station Constructed with Hole-pile Method
Determination of Computational Region of Pipe-soil Interaction System under the Reverse Fault Movement
Mechanics Influence of New Tunnel Intrusion on Pile Foundation in Complex Underground Environment
Full-range Analysis of Steel Reinforced Concrete Column Subjected to Fire
Influence of Shallow-buried Subway Excavation on Urban Pavement Structure

Related Author

焦洋
李秀菊
李鸿晶
仲永涛
安永林
薛保国
冷伍明
岳健

Related Institution

No data
0