您当前的位置:
首页 >
文章列表页 >
In-situ Testing and Analysis of Ground Vibration Caused by CRH Trains Running on Viaduct of Hu-Ning Intercity Railway
更新时间:2025-12-11
    • In-situ Testing and Analysis of Ground Vibration Caused by CRH Trains Running on Viaduct of Hu-Ning Intercity Railway

    • Vol. 32, Issue 3, Pages: 267-273(2012)
    • DOI:10.13409/j.cnki.jdpme.2012.03.002    

      CLC: U435
    • Published:2012

    移动端阅览

  • 毛昆明, 陈国兴, 张杨, et al. In-situ Testing and Analysis of Ground Vibration Caused by CRH Trains Running on Viaduct of Hu-Ning Intercity Railway[J]. 2012, 32(3): 267-273. DOI: 10.13409/j.cnki.jdpme.2012.03.002.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

266

下载量

11

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

In-situ Test and Analysis of Isolation Effect of Vibration Isolating Trench for High Speed Railways
The Study of the Spread of Ground Vibration Caused by Urban Rail Transit
Measurement and Analysis of Metro-induced Floor and Ground Vibration of a Building before and after Construction in Existing Metro Operation Area
Experimental Study of Ground Vibration Caused by Rail Transit

Related Author

毛昆明
陈国兴
张杨
洪小星
张逸静
陈甦
王占生
钟才敏

Related Institution

No data
0