您当前的位置:
首页 >
文章列表页 >
Study on Sequence of Cable Replacement for Cable-stayed Bridge Based on Sensitivity Analysis
更新时间:2025-12-11
    • Study on Sequence of Cable Replacement for Cable-stayed Bridge Based on Sensitivity Analysis

    • Vol. 31, Issue 5, Pages: 590-594(2011)
    • DOI:10.13409/j.cnki.jdpme.2011.05.018    

      CLC: 448.27
    • Published:2011

    移动端阅览

  • 史国刚, 孙洪滨, 吉伯海, et al. Study on Sequence of Cable Replacement for Cable-stayed Bridge Based on Sensitivity Analysis[J]. 2011, 31(5): 590-594. DOI: 10.13409/j.cnki.jdpme.2011.05.018.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

154

下载量

8

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Seismic Performance Analysis and Seismic Responses of Cable-stayed Bridge with Single Tower,Single Cable and Wide Bridge Deck
基于FORM的斜拉桥抗震可靠度分析
Technology and Application of Structural Health Condition Assessment for Sutong Bridge (1): Damage Identification of Stay Cable
Technology and Application of Structural Health Condition Assessment for Sutong Bridge (3): Damage Location Identification of Main Girder
Technology and Application of Structural Health Condition Assessment for Sutong Bridge (2): Damage Alarming of Main Girder

Related Author

筵海岗
周新平
宗雪梅
郑恒斌
余晓琳
李伟
颜全胜
张维苏

Related Institution

No data
0