掌握详细的边坡岩土体参数信息是进行边坡加固与风险评估的重要前提。目前大多采用马尔可夫链蒙特卡洛模拟方法基于现场或室内试验数据进行不确定性参数统计信息及边坡可靠度更新。然而,该方法存在计算量大、计算结果不易收敛和难以解决高维边坡不确定性参数统计特征及可靠度更新等问题。本文基于粒子群优化反向传播神经网络算法建立边坡位移代理模型优化计算过程,提出了改进的基于子集模拟的贝叶斯更新方法,进而基于边坡变形监测数据进行参数统计特征及可靠度更新。最后,将提出方法应用到长春西客站深基坑边坡工程。 结果表明:提出方法能够融合有限的场地信息有效地更新边坡岩土体参数统计特征,推断其后验概率密度函数,进而更新边坡失效概率。利用更新的土体参数计算的边坡位移与实测数据吻合,验证了提出方法的适用性和有效性。另外融合监测数据进行贝叶斯更新之后,虽然土体参数的不确定性明显降低,但是边坡失效概率受外界气温、 监测点位置及数据量值的影响会增大。
Obtaining detailed information on soil parameters is a significant precondition for slope rein-forcement and risk assessment. At present, the Markov chain Monte Carlo (MCMC) simulation is frequently used to update the statistical information of uncertain parameters based on in-situ and/or lab-oratory test data, but it is difficult to solve the problem of high-dimensional slopes due to a large amount of calculation consumption and poor convergence. In this paper, a slope displacement surro-gate model based on particle swarm optimization back propagation neural network is constructed to ac-celerate the calculation process. An improved Bayesian updating with subset simulation (BUS) is pro-posed for updating the statistics of soil parameters and slope reliability based on the monitoring data of slope displacement. The proposed method is then applied to a practical slope project (Changchun West Railway Station's Deep Foundation Pit Slope Project). The results indicate that the proposed method can effectively update the statistics of soil parameters, infer their posterior probability distribu-tion, and further update the probability of slope failure. Then, the slope displacement evaluated using the updated soil parameters agree well with the measured data, which confirms the applicability and ef-fectiveness of the proposed method. Additionally, after the Bayesian updating with the monitoring da-ta, the uncertainties of soil shear strength parameters are significantly reduced, but the probability of slope failure can be increased due to the influences of the ambient temperature, monitoring positions and values of monitoring data.
Zhang L L,Zuo Z B,Ye G L,et al.Probabilistic pa?rameter estimation and predictive uncertainty based onfield measurements for unsaturated soil slope[J].Com?puters and Geotechnics,2013,48:72-81.
Huang J,Kelly R,Li D,et al.Updating reliability ofsingle piles and pile groups by load tests[J].Computersand Geotechnics,2016,73:221-230.
曹子君,赵腾远,王宇,等.基于贝叶斯等效样本的土体杨氏模量的统计特征确定方法[J].防灾减灾工程学报,2015,35(5):581-585.Cao Z J,Zhao T Y,Wang Y,et al.Characterization ofyoung's modulus of soil using bayesian equivalent samo?les[J].Journal of Disaster Prevention and MitigationgEngineering,2015,35(5):581-585.(in Chinese)
Gong W,Juang C H,Martin J R,et al.Probabilisticanalysis of tunnel longitudinal performance based uponconditional random field simulation of soil properties[J].Tunnelling and Underground Space Technology,2018,73:1-14.
Zhang L L,Zhang J,Zhang L M,et al.Back analysisof slope failure with markov chain monte carlo simula?tion[J].Computers and Geotechnics,2010,37(7-8):905-912.
Yang R,Huang J,Griffiths D V,et al.Optimal geo?technical site investigations for slope design[J].Com?puters and Geotechnics,2019,114:103111.
Straub D,Papaioannou I.Bayesian updating with struc?tural reliability methods[J].Journal of Engineering Me?chanics,2015,141(3):04014134.
Jiang S H,Papaioannou I,Straub D.Bayesian updat?ing of slope reliability in spatially variable soils with insitu measurements[J].Engineering Geology,2018,239:310-320.
Li X Y,Zhang L M,Jiang S H.Updating performanceof high rock slopes by combining incremental time-se?ries monitoring data and three-dimensional numericalanalysis[J].International Journal of Rock Mechanicsand Mining Sciences,2016,83:252-261.
陈龙,黄天立.基于贝叶斯更新和逆高斯过程的在役钢筋混凝土桥梁构件可靠度动态预测方法[J].工程力学,2020,37(4):186-195.Chen L,Huang T L.Dynamic prediction of reliabilityof in-service RC bridges using the Bayesian updatingand inverse Gaussian process[J].Engineering Mechan?ics,2020,37(4):186-195(.in Chinese)
万志强,陈建兵.数据稀缺与更新条件下基于概率密度演化-测度变换的认知不确定性量化分析[J].工程力学,2020,37(1):34-42.Wan Z Q,Chen J B.Quantification of epistemic uncer?tainty due to data sparsity and updating based on theframework via synthesizing probability density evolutionmethod and change of probability measure[J].Engineer?ing Mechanics,2020,37(1):34-42(.in Chinese)
Diaz Delao F A,Garbuno-Inigo A,Au S K,et al.Bayesian updating and model class selection with subsetsimulation[J].Computer Methods in Applied Mechan?ics and Engineering,2017,317:1102-1121.
Kenedy J,Eberhart E C.Particle swarm optimization[C]∥Proceedings of IEEE International Conference onNeural Network.New York:IEEE Press,1995:1942-1948.
王桂林,向林川,孙帆.粒子群优化协同克里金法在确定山地斜坡土层厚度中的应用[J].土木建筑与环境工程,2018,40(6):60-66.Wang G L,Xiang L C,Sun F.Application of coopera?tive Kriging method based on particle swarm optimiza?tion in estimation slope soil thickness[J].Journal of Ar?chitectural and Environmental Engineering,2018,40(6):60-66.(in Chinese)
张玉平,马超,李传习,等.基于均匀设计及BP神经网络的大体积混凝土热学参数反分析[J].土木与环境工程学报(中英文),2021,43(2):148-157.Zhang Y P,Ma C,Li C X,et al.Inverse analysis onthermal paramenters of mass concrete base on uniformdesign and BP neural network[J].Journal of Civil andEnvironmental Engineering,2021,43(2):148-157.(in Chinese)
蒋水华,李典庆.边坡可靠度更新的贝叶斯方法[M].北京:科学出版社,2019.Jiang S H,Li D Q.Bayesian approach for updating ofslope reliability[M].Beijing:Science Press.2019.(inChinese).
蒋水华,冯泽文,刘贤,等.基于自适应贝叶斯更新方法的岩土参数概率分布推断[J].岩土力学,2020,41(1):325-335.Jiang S H,Feng Z W,Liu X,et al.Inference of proba?bility distributions of geotechnical parameters usingadaptive Bayesian updating approach[J].Rock and SoilMechanics,2020,41(1):325-335(.in Chinese)
王小兵,夏晓舟,章青.基于正交试验和神经网络的堤防边坡抗滑稳定可靠度研究[J].长江科学院院报,2019,36(10):89-93.Wang X B,Xia X Z,Zhang Q.Reliability analysis onanti-sliding stability of levee slope based on orthogonaltest and network[J].Journal of Yangtze River ScientificResearch Institute,2019,36(10):89-93(.in Chinese)
Straub D,Papaioannou I,Betz W.Bayesian analysis ofrare events[J].Journal of Computational Physics,2016,314:538-556.
姜屏.基于位移实时监测的季节冰冻区土质边坡稳定性分析方法研究[D].长春:吉林大学,2012.Jiang P.Study on analysis method of soil slope stabilityin seasonal frozen region based on real-time monitoringof displacement [D].Changchun:Jilin University,2012(.in Chinese)
陈育民,徐鼎平.FLAC/FLAC3D 基础与工程实例[M].第二版.北京:中国水利水电出版社,2013.Chen Y M,Xu D P.FLAC/FLAC3D foundation andengineering examples[M].Second Edition.Beijing:China Water & Power Press,2013.(in Chinese)
Mollon G,Dias D,Soubra A H.Probabilistic analysisof circular tunnels in homogeneous soil using responsesurface methodology[J].Journal of Geotechnical andGeoenvironmental Engineering,2009,135(9):1314-1325.
Bauer J,Pu?a W.Reliability with respect to settlementlimit-states of shallow foundations on linearly-deform?able subsoil[J].Computers and Geotechnics,2000,26(3-4):281-308.
Papaioannou I,Straub D.Reliability updating in geo?technical engineering including spatial variability of soil[J].Computers and Geotechnics,2012,42:44-51.
Shinoda M,Horii K,Yonezawa T,et al.Reliabilitybased seismic deformation analysis of reinforced soilslopes[J].Soils and Foundations,2006,46(4):477-490.
Mollon G,Dias D,Soubra A H.Probabilistic analysesof tunneling-induced ground movements[J].Acta Geo?technica,2013,8(2):181-199.
蒋水华,彭铭,李典庆,等.考虑时效特性的锚固岩质边坡变形可靠度分析[J].岩石力学与工程学报,2013,32(6):1270-1278.Jiang S H,Peng M,Li D Q,et al.Time-variant ser?viceability reliability analysis of anchored rock slopes de?formation[J].Rock and Soil Mechanics,2013,32(6):1270-1278.(in Chinese)