您当前的位置:
首页 >
文章列表页 >
地下厂房爆破开挖对混凝土吊车梁的影响研究
更新时间:2025-12-11
    • 地下厂房爆破开挖对混凝土吊车梁的影响研究

    • Issue 1, Pages: 58-62(2005)
    • CLC: V554
    • Published:2005

    移动端阅览

  • 崔积弘, 林从谋, 赵锦桥, et al. 地下厂房爆破开挖对混凝土吊车梁的影响研究[J]. 2005, (1): 58-62. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

65

下载量

4

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Numerical Simulation of Deep-level Rockburst Using ANSYS FEM Software
Finite Element Analysis of Mechanical Properties of Pile-cap Connections for Prestressed Concrete Solid Pile Using Snap-in Mechanical Connection
Numerical Simulation of the Influence of Unloading Time on the Cracking and Stress Wave Propagation in a Circular Tunnel Surrounding Rock
Wind-induced Interference Effects of Low-rise Buildings with Different Heights under Strong Wind
Numerical Simulation on the Effect of Plant Root Systems on Soil Reinforcement on the Stability of Collapsing Gullies

Related Author

唐巨鹏
李英杰
潘一山
孙传智
缪长青
李爱群
乔燕
马冰

Related Institution

No data
0