1.华侨大学土木工程学院,福建 厦门 361021
2.厦门市抗火综合防灾工程技术研究中心,福建 厦门 361021
3.福建省建筑科学研究院有限责任公司,福建 福州 350100
范光明(1992—),男,硕士研究生。主要从事结构抗火方面的研究。E-mail:786176841@qq.com
王卫华(1980—),男,副教授,硕导,博士。主要从事组合结构与抗火性能研究。E-mail:whwang@hqu.edu.cn
收稿:2022-05-04,
修回:2022-06-27,
纸质出版:2023-12-15
移动端阅览
范光明,王卫华,徐哲人等.复式钢管混凝土柱装配式连接锚固性能试验研究[J].防灾减灾工程学报,2023,43(06):1331-1345.
FAN Guangming,WANG Weihua,XU Zheren,et al.Experimental Study on Anchorage Performance of Fabricated Connection of Composite‑sectioned Concrete‑filled Steel Tubular Column[J].Journal of Disaster Prevention and Mitigation Engineering,2023,43(06):1331-1345.
范光明,王卫华,徐哲人等.复式钢管混凝土柱装配式连接锚固性能试验研究[J].防灾减灾工程学报,2023,43(06):1331-1345. DOI: 10.13409/j.cnki.jdpme.20220504004.
FAN Guangming,WANG Weihua,XU Zheren,et al.Experimental Study on Anchorage Performance of Fabricated Connection of Composite‑sectioned Concrete‑filled Steel Tubular Column[J].Journal of Disaster Prevention and Mitigation Engineering,2023,43(06):1331-1345. DOI: 10.13409/j.cnki.jdpme.20220504004.
预制混凝土构件通常采用先拼接后灌浆的连接方式,一旦灌浆不密实,将存在严重安全隐患。为了解决装配式复式钢管混凝土结构的连接问题,探索更方便可靠的连接方式,将先灌浆后插筋的连接方式运用到装配式复式钢管混凝土柱的连接中,系统研究了该连接方式下装配式复式钢管混凝土柱中的钢筋锚固性能和锚固长度。并通过设计制作36个复式钢管混凝土柱的灌浆插筋锚固试件,采用拉拔试验方法研究了钢筋直径、位置、锚固长度、预制孔形式及直径、灌浆料强度、混凝土强度7个影响因素对浆锚钢筋在复式钢管混凝土柱中的锚固性能影响。研究结果表明:(1)试件的典型破坏形式包括钢筋未屈服拔出、钢筋受拉屈服拔出、钢筋拉断三种形式,主要发生钢筋屈服后试件破坏,锚固性能良好;(2)浆锚钢筋在灌浆料中的受力过程主要分为四个阶段:弹性阶段、屈服阶段、强化阶段和破坏阶段;(3)预制孔直径、混凝土强度、灌浆料强度越大,锚固钢筋锚固性能越好;(4)角部浆锚钢筋的极限承载力和极限黏结应力均比中部浆锚钢筋大;(5)复合钢管混凝土柱装配式连接的锚固长度建议根据《混凝土结构设计规范》进行计算确定,且预制孔直径不小于2
d
,且不宜小于32 mm。
The traditional prefabricated RC structures were anchored by cement injection, but incomplete grouting posed significant safety risks. In order to solve the connection problem of the assembled composite-sectioned concrete-filled steel tubular (CS-CFST) structure and explore a more convenient and reliable connection mode, this paper applied the connection mode of grouting first and then inserting reinforcement to connect the assembled CS-CFST columns, and systematically studied the anchorage performance of the reinforcement in the assembled CS-CFST columns under this connection mode. By designing 36 groups of grouting before inserted rebar anchorage specimens of CS-CFST columns and using pull-out test method, the influence of seven factors on the anchorage performance of the grout anchored steel bars in the CS-CFST columns were systematically studied, including rebar diameter, position and rebar anchorage length, prefabricated hole form and diameter, grouting material strength and concrete strength. The results show that: (1) Three typical failure modes are identified, including the inserted rebar being pull out without yielding, the inserted rebar being pull out after yielding, and the tensile rupture of the inserted rebar. (2) The stress process of mortar anchor reinforcement in grouting material is mainly divided into four stages: elastic stage, yield stage, strengthening stage and failure stage. (3) The anchorage performance improves with larger prefabricated hole diameters and stronger grouting material and concrete. (4) The ultimate bearing capacity and ultimate bond stress of the anchored rebar in the corner are larger than those in the middle of the steel side; (5) The anchorage length of the fabricated connection of concrete filled steel tubular composite column is recommended to be determined according to GB50010-2010, and the dimeter of the prefabricated holes is more than 2 times of the inserted rebar diameter, and no less than 32mm.
陈宝春 , 牟廷敏 , 陈宜言 , 等 . 我国钢-混凝土组合结构桥梁研究进展及工程应用 [J]. 建筑结构学报 , 2013 , 34 ( 增1 ): 1 - 10 .
Chen B C , Mu T M , Chen Y Y , et al . State-of-the-art of research and engineering application of steel-concrete composite bridges in China [J]. Journal of Building Structures , 2013 , 34 ( Sup 1 ): 1 - 10 . (in Chinese)
聂建国 , 陶慕轩 , 吴丽丽 , 等 . 钢-混凝土组合结构桥梁研究新进展 [J]. 土木工程学报 , 2012 , 45 ( 6 ): 110 - 122 .
Nie J G , Tao M X , Wu L L , et al . Advances of research on steel-cncrete composite bridges [J]. China Civil Engineering Journal , 2012 , 45 ( 6 ): 110 - 122 . (in Chinese)
汪大绥 , 周建龙 . 我国高层建筑钢-混凝土混合结构发展与展望 [J]. 建筑结构学报 , 2010 , 31 ( 6 ): 62 - 70 .
Wang D S , Zhou J L . Development and prospect of hybrid high-rise building structures in China [J]. Journal of Building Structures , 2010 , 31 ( 6 ): 62 - 70 . (in Chinese)
赵均海 , 胡壹 , 张冬芳 , 等 . 装配式复式钢管混凝土柱-钢梁框架抗震性能试验研究 [J]. 建筑结构学报 , 2020 , 41 ( 8 ): 88 - 96 .
Zhao J H , Hu Y , Zhang D F , et al . Experimental investigation on seismic performance of assembled concrete-filled double-skin steel tube-steel beam frames [J]. Journal of Building Structures , 2020 , 41 ( 8 ): 88 - 96 . (in Chinese)
张玉芳 , 赵均海 , 张冬芳 . 复式钢管混凝土柱-钢梁节点受力机理及承载力 [J]. 长安大学学报 , 2015 , 35 ( 5 ): 82 - 88 .
Zhang Y F , Zhao J H , Zhang D F . Force transference mechanism and bearing capacity of connection between composite CFST column and steel beam [J]. Journal of Chang'an University , 2015 , 35 ( 5 ): 82 - 88 . (in Chinese)
赵均海 , 胡壹 , 张冬芳 . 装配式复式钢管混凝土柱-梁端连接钢板剪力墙抗震性能试验研究 [J]. 土木工程学报 , 2020 , 53 ( 5 ): 78 - 88 .
Zhao J H , Hu Y , Zhang D F . Experimental investigation on seismic performance of assembly CFDST frame with beam-connected steel plate shear walls [J]. China Civil Engineering Journal , 2020 , 53 ( 5 ): 78 - 88 . (in Chinese)
吴涛 , 刘全威 , 张磊 , 等 . 预制混凝土构件钢筋约束浆锚连接技术发展展望 [J]. 西安建筑科技大学学报(自然科学版) , 2015 , 47 ( 6 ): 776 - 780 .
Wu T , Liu Q W , Zhang L , et al . Research on constraint grout-filled lap connection for precast concrete [J]. Journal of Xi'an University of Architecture & Technology(Natural Science Edition) , 2015 , 47 ( 6 ): 776 - 780 . (in Chinese)
张伟 . 装配整体式混凝土结构钢筋连接技术研究 [D]. 西安 : 长安大学 , 2015 .
Zhang W . The technique study of reinforcement splice in assemble monolithic concrete structure [D]. Xi'an : Chang'an University , 2015 . (in Chinese)
马军卫 , 尹万云 , 刘守城 , 等 . 钢筋约束浆锚搭接连接的试验研究 [J]. 建筑结构 , 2015 , 45 ( 2 ): 32 - 35,79 .
Ma J W , Yin W Y , Liu S C , et al . Experimental study on constraint grout-filled lap connection of steel bar [J]. Building Structure , 2015 , 45 ( 2 ): 32 - 35,79 . (in Chinese)
王东辉 , 柳旭东 , 刘英亮 , 等 . 水泥灌浆料套筒连接接头拉伸极限承载力试验研究 [J]. 建筑结构 , 2015 , 45 ( 6 ): 21 - 23 .
Wang D H , Liu X D , Liu Y L , et al . Experimental study on ultimate tensile bearing capacity of cement grouting sleeve connection [J]. Building Structure , 2015 , 45 ( 6 ): 21 - 23 . (in Chinese)
李锐 , 郑毅敏 , 赵勇 . 配置500 MPa钢筋套筒灌浆连接预制混凝土柱抗震性能试验研究 [J]. 建筑结构学报 , 2016 , 37 ( 5 ): 255 - 263 .
Li R , Zheng Y M , Zhao Y . Experimental research on seismic performance of precast concrete columns with 500 MPa reinforcements splicing by grout-filled coupling sleeves [J]. Journal of Building Structures , 2016 , 37 ( 5 ): 255 - 263 . (in Chinese)
章一萍 , 冯波 , 熊峰 , 等 . 套筒灌浆连接纵筋的预制钢筋混凝土短柱抗震性能试验研究 [J]. 建筑结构 , 2015 , 45 ( 15 ): 81 - 86 .
Zhang Y P , Feng B , Xiong F , et al . Experimental study on seismic behavior of precast reinforced concrete short columns with grouted sleeves connecting longitudinal reinforcements [J]. Building Structure , 2015 , 45 ( 15 ): 81 - 86 . (in Chinese)
姜洪斌 , 张海顺 , 刘文清 , 等 . 预制混凝土插入式预留孔灌浆钢筋搭接试验 [J]. 哈尔滨工业大学学报 , 2011 , 43 ( 10 ): 18 - 23 .
Jiang H B , Zhang H X , Liu W Q , et al . Experimental study on plug-in filling hole for steel bar lapping of precast concrete structure [J]. Journal of Harbin Institute of Technology , 2011 , 43 ( 10 ): 18 - 23 . (in Chinese)
姜洪斌 , 张海顺 , 刘文清 , 等 . 预制混凝土结构插入式预留孔灌浆钢筋锚固性能 [J]. 哈尔滨工业大学学报 , 2011 , 43 ( 4 ): 28 - 31,36 .
Jiang H B , Zhang H X , Liu W Q , et al . Experimental study on plug-in filling hole for steel bar anchorage of the PC structure [J]. Journal of Harbin Institute of Technology , 2011 , 43 ( 4 ): 28 - 31,36 . (in Chinese)
余琼 , 许雪静 , 尤高帅 . 带肋钢筋与灌浆料黏结性能试验 [J]. 哈尔滨工业大学学报 , 2017 , 49 ( 12 ): 91 ‑ 101 .
Yu Q , Xu X J , You G S . Experimental study on bond behavior for ribbed steel bars and grout [J]. Journal of Harbin Institute of Technology , 2017 , 49 ( 12 ): 91 - 101 . (in Chinese)
郑建岚 , 庄金平 . 自密实混凝土与钢筋的粘结性能试验研究 [J]. 工程力学 , 2013 , 30 ( 2 ): 112 - 117 .
Zheng J L , Zhuang J P . Experiment research on bond properties between self-compacting concrete and reinforcement [J]. Engineering Mechanics , 2013 , 30 ( 2 ): 112 - 117 . (in Chinese)
普通混凝土配合比设计规程 : JGJ—2011 [S]. 北京 : 中国建筑工学出版社 , 2011 .
水泥基灌浆材料应用技术规范 : GB/T50448—2015 [S]. 北京 : 中国建筑工学出版社 , 2015 .
金属材料拉伸试验第1部分:室温试验方法 : GB/T228.1—2010 [S]. 北京 : 中国标准出版社 , 2010 .
张建伟 , 李晨 , 冯曹杰 , 等 . HRB600级钢筋与高强混凝土的粘结性能试验研究 [J]. 北京工业大学学报 , 2019 , 45 ( 6 ): 565 - 574 .
Zhang J W , Li C , Feng C J , et al . Experimental study on bond behavior between HRB600 steel bars and high-strength concrete [J]. Journal of Beijing University of Technology , 2019 , 45 ( 6 ): 565 - 574 . (in Chinese)
徐有邻 , 邵卓民 , 沈文都 . 钢筋与混凝土的粘结锚固强度 [J]. 建筑科学 , 1988 ( 4 ): 8 - 14 .
Xu Y L , Shao Z M , Shen W D . Bonding strength of steel and concrete [J]. Building Science , 1988 ( 4 ): 8 - 14 . (in Chinese)
欧阳煜 , 赖校君 . 高强钢筋高强混凝土粘结性能的试验与分析 [J]. 工业建筑 , 2007 , 37 ( 5 ): 77 - 81 .
Ouyang Y , Lai X J . Experiment and analysis of bond performance between high-strength reinforcing bar and high-strength concrete [J]. Industrial Construction , 2007 , 37 ( 5 ): 77 - 81 . (in Chinese)
胡志坚 , 姚鹏飞 , 周知 . 预制拼装混凝土桥梁连接钢筋粘结锚固性能 [J]. 哈尔滨工业大学学报 , 2021 , 53 ( 3 ): 82 - 93 .
Hu Z J , Yao P F , Zhou Z . Bonding and anchoring properties of connecting steel bars of prefabricated concrete bridges [J]. Journal of Harbin Institute of Technology , 2021 , 53 ( 3 ): 82 - 93 . (in Chinese)
山显彬 . 变形钢筋与自密实混凝土之间粘结锚固性能试验研究 [D]. 哈尔滨 : 哈尔滨工业大学 , 2008 .
Shan X B . Experimental research on bonding prop-erties between deformed bars and self-compacting concrete [D]. Harbin : Harbin Institute of Technology , 2008 . (in Chinese)
余琼 , 孙佳秋 , 袁炜航 . 带肋钢筋与套筒约束灌浆料黏结性能试验 [J]. 哈尔滨工业大学学报 , 2018 , 50 ( 12 ): 98 - 106 .
Yu Q , Sun J Q , Yuan W H . Experimental study on bond behavior for ribbed steel bars and sleeve constrained grouting material [J]. Journal of Harbin Institute of Technology , 2018 , 50 ( 12 ): 98 - 106 . (in Chinese)
混凝土结构设计规范 : GB50010—2010 [S]. 北京 : 中国建筑工业出版社 , 2015 .
0