曹璇,刘佳欣,孔纲强等.基于能源桩的桥面融雪系统经济效益评估[J].防灾减灾工程学报,2024,44(04):881-892.
CAO Xuan,LIU Jiaxin,KONG Gangqiang,et al.Economic Benefit Evaluation of Energy Pile‑based Bridge Deck Snow Melting System[J].Journal of Disaster Prevention and Mitigation Engineering,2024,44(04):881-892.
曹璇,刘佳欣,孔纲强等.基于能源桩的桥面融雪系统经济效益评估[J].防灾减灾工程学报,2024,44(04):881-892. DOI: 10.13409/j.cnki.jdpme.20230927022.
CAO Xuan,LIU Jiaxin,KONG Gangqiang,et al.Economic Benefit Evaluation of Energy Pile‑based Bridge Deck Snow Melting System[J].Journal of Disaster Prevention and Mitigation Engineering,2024,44(04):881-892. DOI: 10.13409/j.cnki.jdpme.20230927022.
基于能源桩的桥面融雪系统,利用清洁绿色的地热能为道路融雪除冰,从而降低碳排放,与我国“双碳”战略发展趋势相契合。在技术落地过程中,实现优化设计从而降低成本至关重要。通过数值模拟方法,研究了该系统在中国不同气候区的产热量,并计算了三级融雪目标下桥面融雪所需热量。同时,建立了成本测算模型,分析了各气候区代表城市最具经济效益的能源桩融雪方案,并基于该模型开发了计算软件,以简化应用流程。研究结果表明:在短期运行中,桥面建安费和热泵费用是对成本影响最大的因素。然而,在长期运行中电价成为最关键因素;当热通量需求变化时,电力融雪系统的总成本增量约为能源桩融雪系统的2倍;在恶劣气候环境和更严苛的融雪目标下,能源桩融雪系统的相对节省曲线更陡峭,优势显著;此外,国家政策的积极支持能弥补该系统初始投资成本高的短板,增强其市场竞争力。
The bridge deck snow melting system based on energy piles utilizes clean and green geothermal energy for snow melting and de-icing on roads
thereby reducing carbon emissions
which aligns with China's development direction under the "dual carbon" strategy. In the process of technological implementation
design optimization is crucial for cost reduction. Through numerical simulation methods
the paper studied the heat production of the system in different climate zones in China and calculated the heat required for snow melting on bridge decks under three different levels of snow melting targets. Additionally
a cost estimation model was established to analyze the most cost-effective energy pile-based snow melting scheme for representative cities in each climate zone. Based on this model
calculation software was developed to simplify the application process. The results showed that the construction and installation costs of the bridge deck and heat pump costs had the greatest impact on the overall costs in short-term operations. However
in the long run
electricity prices became the most critical factor. With changes in heat flux demand
the total cost increase in electricity-based snow melting system was about twice that of energy pile-based system. In harsh climates and with more stringent snow melting targets
the relative saving curve of the energy pile-based snow melting system was steeper
showing significant advantages. Moreover
national policy support can offset the high initial investment cost of this system
enhancing its market competitiveness.
Xu H , Wang D , Tan Y , et al . Investigation of design alternatives for hydronic snow melting pavement systems in China [J]. Journal of Cleaner Production , 2018 , 170 : 1413 - 1422 .
Habibzadeh-Bigdarvish O , Yu X , Lei G , et al . Life-cycle cost-benefit analysis of bridge deck de-icing using geothermal heat pump system: a case study of North Texas [J]. Sustainable Cities and Society , 2019 , 47 : 101492 .
Xu H , Tan Y . Modeling and operation strategy of pavement snow melting systems utilizing low-temperature heating fluids [J]. Energy , 2015 , 80 : 666 - 676 .
Sassani A , Ceylan H , Kim S , et al . Development of carbon fiber-modified electrically conductive concrete for implementation in Des Moines International Airport [J]. Case Studies in Construction Materials , 2018 , 8 : 277 - 291 .
Liu K , Fu C , Xie H , et al . Design of electric heat pipe embedding schemes for snow-melting pavement based on mechanical properties in cold regions [J]. Cold Regions Science and Technology , 2019 , 165 : 102806 .
Won J P , Kim C K , Lee S J , et al . Thermal characteristics of a conductive cement-based composite for a snow-melting heated pavement system [J]. Composite Structures , 2014 , 118 : 106 - 111 .
Kim S , Oh H J , Han S J , et al . Development of black-ice removal system with latent heat thermal energy storage and solar thermal collectors [J]. Energy , 2022 , 244 : 122721 .
徐慧宁,流体加热道路融雪系统温—湿耦合融雪模型及仿真分析 [D]. 哈尔滨 : 哈尔滨工业大学 , 2011 .
Xu H N . Development and simulation of a heat and mass coupled snow melting model for hydronic heated pavement [D]. Harbin : Harbin Institute of Technology , 2011 . (in Chinese)
Hamada Y , Nakamura M , Kubota H . Field measurements and analyses for a hybrid system for snow storage/melting and air conditioning by using renewable energy [J]. Applied Energy , 2007 , 84 ( 2 ): 117 - 134 .
Balbay A , Esen M . Experimental investigation of using ground source heat pump system for snow melting on pavements and bridge decks [J]. Scientific Research and Essays , 2010 , 5 ( 24 ): 3955 - 3966 .
Zhao W , Zhang Y , Chen X , et al . Experimental heating performances of a ground source heat pump (GSHP) for heating road unit [J]. Energy Conversion and Management: X , 2020 , 7 : 100040 .
Dupray F , Li C , Laloui L . Heat-exchanger piles for the deicing of bridges [J]. Acta Geotechnica , 2014 , 9 : 413 - 423 .
桂树强 , 程晓辉 , 张志鹏 . 地源热泵桩基与钻孔埋管换热器换热性能比较 [J]. 土木建筑与环境工程 , 2013 , 35 ( 3 ): 151 - 156 .
Gui S Q , Cheng X H , Zhang Z P . Comparative analysis of heat exchange performance of energy piles and borehole heat exchangers in GSHP system [J]. Journal of Civil and Environmental Engineering , 2013 , 35 ( 3 ): 151 - 156 . (in Chinese)
党政 , 关文 , 程晓辉 , 等 . CFG能源桩用于混凝土路面除冰降温的试验研究 [J]. 中国公路学报 , 2019 , 32 ( 2 ): 19 - 30 .
Dang Z , Guan W , Cheng X H , et al . Experimental study on CFG energy pile for concrete pavement deicing and cooling [J]. China Journal of Highway and Transport , 2019 , 32 ( 2 ): 19 - 30 . (in Chinese)
Kong G , Wu D , Liu H , et al . Performance of a geothermal energy deicing system for bridge deck using a pile heat exchanger [J]. International Journal of Energy Research , 2019 , 43 ( 1 ): 596 - 603 .
陈鑫 , 孔纲强 , 王忠涛 , 等 . 能量桩桥面除冰融雪的能源需求与供给能力案例分析 [J]. 中国公路学报 , 2023 , 36 ( 3 ): 202 - 210 .
Chen X , Kong G Q , Wang Z T , et al . Case studies on energy demand and capacity of bridge deck deicing and snow melting technology based on energy piles [J]. China Journal of Highway and Transport , 2023 , 36 ( 3 ): 202 - 210 . (in Chinese)
Han C , Yu X B . Feasibility of geothermal heat exchanger pile-based bridge deck snow melting system: a simulation based analysis [J]. Renewable Energy , 2017 , 101 : 214 - 224 .
Liu H , Maghoul P , Bahari A , et al . Feasibility study of snow melting system for bridge decks using geothermal energy piles integrated with heat pump in Canada [J]. Renewable Energy , 2019 , 136 : 1266 - 1280 .
闫振国 , 曾姝 , 杨军 , 等 . 用于机场道面融雪的能源桩系统优化研究 [J]. 防灾减灾工程学报 , 2022 , 42 ( 5 ): 881 - 887 .
Yan Z G , Zeng S , Yang J , et al . Study on optimization of energy pile system for snow melting on airport pavement [J]. Journal of Disaster Prevention and Mitigation Engineering , 2022 , 42 ( 5 ): 881 - 887 . (in Chinese)
Chen X , Kong G , Liu H , et al . Field tests on the prediction of heating power requirements for deicing in Jiangyin, China [J]. Geomechanics for Energy and the Environment , 2022 , 32 : 100293 .
Chapman W P , Katunich S . Heat requirements of snow melting systems [J]. ASHAE Transactions , 1956 , 62 : 359 - 372 .
杨钤 , 靳玮 , 苏庆宗 , 等 . 基于空气源热泵的新型低温蒸发浓缩系统的实验探究 [J]. 现代化工 , 2022 , 42 ( 增2 ): 359 - 364, 369 .
Yang Q , Jin W , Su Q Z , et al . Experimental research on a new low-temperature evaporation-concentration system based on air source heat pump [J]. Modern Chemical Industry , 2022 , 42 ( Sup2 ): 359 - 364,369 . (in Chinese)
Li X , Chen Y , Chen Z , et al . Thermal performances of different types of underground heat exchangers [J]. Energy and Buildings , 2006 , 38 ( 5 ): 543 - 547 .
Laloui L , Nuth M , Vulliet L . Experimental and numerical investigations of the behaviour of a heat exchanger pile [J]. International Journal for Numerical and Analytical Methods in Geomechanics , 2006 , 30 ( 8 ): 763 - 781 .
Doughty C . Seasonal thermal energy storage in unsaturated soils: Model development and field validation [R]. Berkeley : Lawrence Berkeley National Laboratory , 1991 .
0
浏览量
0
下载量
0
CSCD
关联资源
相关文章
相关作者
相关机构
苏公网安备32010202012147号