郜新军, 赵成刚, 郭院成, et al. Dynamic Response Analysis of Long-span Continuous Bridge under Action of Vertical Load Caused by Earthquake and Train[J]. 2015, 35(4): 543-548.
郜新军, 赵成刚, 郭院成, et al. Dynamic Response Analysis of Long-span Continuous Bridge under Action of Vertical Load Caused by Earthquake and Train[J]. 2015, 35(4): 543-548. DOI: 10.13409/j.cnki.jdpme.2015.04.021.
地震、列车竖向荷载共同作用下大跨桥梁的动力响应分析
摘要
以地震、列车荷载共同作用下的大跨桥梁为研究对象
基于有限元分析软件
建立了地震波斜入射下包括地基土体在内的车-桥耦合动力数值分析模型。通过改变地震波的入射角度及车速
对桥梁的动力响应进行了计算分析。结果表明
地震波入射角度对桥梁的动力响应有显著的影响
随着入射角度的增大
跨中竖向位移、速度都不断地增大;在地震作用下
列车速度对桥梁动力响应的影响相对较小
桥梁结构的动力响应并不总是随着列车运行速度的增加而增加
而是在某一速度达到最大;考虑土-结构动力相互作用(SSI)时
桥梁参考点处的竖向位移显著增大
而跨中弯矩有所减小。
Abstract
The research object is long-span continuous bridge which is effected by earthquakes and train load simultaneously
a numerical model of coupled vibrations between vehicles and highway long-span continuous bridge involved in soil foundation under oblique incidence of seismic wave was established by finite element software.The dynamic respones of the bridge were calculated and analyzed through altering the angle of incidence of seismic waves and the train speed.The results show that seismic wave incident angle has a significant effect on the dynamic response of the bridge
with increase of incident angle
the vertical displacement and velocity of mid-span increase constantly;at the same time
the train speed has a relatively small effect on the dynamic response of the bridge in the earthquake
and the dynamic response of the bridge do not increase always with increase of train speed
but reach maximum at a certain speed.The vertical displacement of reference points increases significantly and the moment at mid-span reduces when considering soilstructure interaction in calculation.