纸质出版:2013
移动端阅览
[1]王小庆,金先龙,杨颜志,王建.超高层建筑幕墙施工过程分析[J].防灾减灾工程学报,2013,33(06):730-735.
王小庆, 金先龙, 杨颜志, et al. Research on the Curtain Wall Construction Process of Super Tall Buildings[J]. 2013, 33(6): 730-735.
[1]王小庆,金先龙,杨颜志,王建.超高层建筑幕墙施工过程分析[J].防灾减灾工程学报,2013,33(06):730-735. DOI: 10.13409/j.cnki.jdpme.2013.06.018.
王小庆, 金先龙, 杨颜志, et al. Research on the Curtain Wall Construction Process of Super Tall Buildings[J]. 2013, 33(6): 730-735. DOI: 10.13409/j.cnki.jdpme.2013.06.018.
传统的幕墙结构设计
往往忽略施工过程对其安全性的影响
这种近似的分析方法会与实际情况有较大差异
结果不可信。尤其对于超高层建筑
其施工过程中力学变化复杂
对幕墙整体安全性的影响具有一定未知性
需要深入分析。针对此问题
结合刚度迁移法对上海中心大厦幕墙施工过程进行研究
重点分析了典型分区幕墙支撑结构应力及吊杆变形在施工中的变化;利用显式有限元方法分析了伸臂桁架的合拢次序
保证了幕墙施工的安全性。结果表明:幕墙支撑结构应力在各施工阶段存在差异
幕墙玻璃施工结束后
应力达到最大值
后续施工中
应力逐渐减小;吊杆最大竖向变形量出现在本区幕墙玻璃施工中;为保证幕墙施工的安全性
应合理安排伸臂桁架的合拢次序及时间。
In the traditional design of curtain wall
engineers often ignore the effect of construction process on the safety of the curtain wall.The results of this approximate analysis method is quite different from the actual situation.The results are not credible.Especially for the high-rise buildings
the mechanical changes are complex during the construction.Its impact on the overall security of the curtain wall is unknown
so deep study is required in this field.To solve this problem
the curtain wall construction process of Shanghai Center Tower is analyzed by stiffness transferring method in this paper.The change of supporting structure stress and the sag rod deformation of the representative partition curtain wall in the construction is analyzed intensively.The safety of curtain wall construction was guaranteed by the analysis of lock-in sequence of the outriggers with explicit finite element method.The results shows that the supporting structure stress of the curtain wall is not alike in different construction stages
after the construction of the local curtain wall glass it reaches maximum and in the following stages its value falls down.The maximum vertical deformation of the sag rods exists after the construction of the glass.To ensure the safety of the curtain wall construction the outriggers should be lock-in according to a reasonable arrangement with proper time and order.
超高层混合结构施工阶段结构性能评估与控制 [J]. 赵昕,刘南乡,孙华华,郑毅敏,丁洁民. 建筑结构学报 . 2011(07)
带伸臂超高层结构最优伸臂道数及位置确定的灵敏度向量法 [J]. 赵昕,刘南乡,郑毅敏,丁洁民. 建筑结构 . 2011(05)
基于并行计算的盾构机过大堤三维数值模拟 [J]. 沈建奇,金先龙,王吉云. 上海交通大学学报 . 2008(08)
某高层建筑带加强层结构设计方案分析 [J]. 赵昕,郑毅敏,胡宇滨,徐文华. 建筑结构 . 2006(S1)
LS-DYNA3D理论基础与实例分析[M]. 科学出版社 , 白金泽编著, 2005