针对西安地铁留核心土、上下半洞开挖、超前小导管注浆加固与水平钢撑锁脚的钢拱架和挂网喷层支护的饱和黄土隧道
根据现场地面沉降监测数据
分析了隧道右线、左线掌子面间隔30m开挖过程中洞顶地表沉降变形的历时变化规律
以及左、右线单洞沉降槽和双线沉降槽的分布特征。结果表明
洞顶地表沉降变形可以划分为初期沉降变形、右线开挖主变形、左线开挖主变形及沉降变形稳定4个阶段;左、右线单洞沉降槽和双线沉降槽均可用高斯分布曲线拟合。基于沉降槽Peck公式及O’Reilly和New最大沉降与隧道埋深的关系
得到了饱和黄土隧道单洞与双洞地面沉降槽的宽度和最大沉降
以及右、左线隧道先后开挖单洞的沉降槽宽度比和最大沉降比。考虑双线隧道洞间距、左右洞先后开挖地层松动相互影响以及围岩饱和黄土固结变形的影响
提出了一种饱和黄土隧道双洞开挖施工引起地表沉降的预测模型
验证了该预测模型应用的可靠性。
The asymmetric settlement of ground surface caused by the excavation of tunnel in the subway is a key problem in engineering.The settlement trough of saturated loess tunnel with double lines
was monitored by the water level.The surface settlement of the top of right and left tunnels with 30 meter distance between two excavation surfaces changing with time and the characteristics of settlement troughs of single tunnel and double tunnels were analyzed with the monitoring results.It is shown that the settlement can be divided into four stages
including the initial settlement stage
the right tunnel excavation inducing settlement stage
the left tunnel excavation inducing settlement stage and the settlement going to stable stage
and the settlement trough can be described by the Gauss’s distribution curve.Based on the Peck formula of settlement trough and the relationship between settlement trough and burying depth proposed by O’Reilly and New
the width of settlement trough
the maximum settlement of single tunnel and double tunnels
the ratio of settlement trough and maximum settlement of right and left single tunnel was obtained by analyzing the monitoring data.Considering the consolidation deformation of saturated loess
settlement caused by the strata becoming flexible in the stress releasing process of excavation and wall rock of new tunnel disturbed by the excavation of former single tunnel
a calculation model of settlement trough of saturated loess tunnel with double lines was proposed by the addition of settlement trough of two tunnels.
城市地铁隧道施工引起的地面沉降 [J]. 缪林昌,王非,吕伟华. 东南大学学报(自然科学版) . 2008(02)
Peck公式在我国隧道施工地面变形预测中的适用性分析 [J]. 韩煊,李宁,J.R.Standing. 岩土力学 . 2007(01)
北京地铁东四站地表沉降监测数据分析 [J]. 郑怀洲. 铁道标准设计 . 2006(04)
隧道开挖引起土层沉降槽曲线形态的分析与计算 [J]. 姜忻良,赵志民,李园. 岩土力学 . 2004(10)
0
浏览量
533
下载量
24
CSCD
关联资源
相关文章
相关作者
相关机构
苏公网安备32010202012147号